
Ongoing testing and enhanced site-specific calibration of the RokTel unit has enabled the system to be utilised as a condition assessment tool in areas of …
Freeport Indonesia – 2013 to 2018 ongoing

A corrosion assessment of short anchor bolts holding up platform runners in a Hydro Station tailrace were assessed during an outage in 2013. Due to …
Runner Platform Anchor Bolts – TAS Australia, 2013

Rock fall nets in Austria are restrained using solid bar anchors. The RokTel system is being used to assess the condition of these anchors including …
Rock fall net anchor restraints – Austria, 2013

Many bridges in Queensland are designed to incorporate transverse stressing bars holding the individual precast deck units together to act as one unit. 3 bridges …
Bridge Transverse Stressing Bars – QLD Australia, 2013

A quality audit of cable bolt installation using RokTel is being carried out at an underground mine in New South Wales to allow the contractor …
Underground Mine – NSW Australia, 2013

Non-destructive Integrity testing of crane rail restraint bolts for an underground gantry crane in a hydroelectric power station in Tasmania using RokTel was completed during …
Cethana Hydro Electric Power Station – TAS Australia, 2013

Integrity assessment of 32mm diameter 22m long tie-rods supporting sheet pile walls along a tunnel shaft. Following the failure of 3 tie-rods, testing was carried out …