Ongoing testing and enhanced site-specific calibration of the RokTel unit has enabled the system to be utilised as a condition assessment tool in areas of …
Freeport Indonesia – 2013 to 2018 ongoing

Design, manufacture and installation of permanent corrosion monitoring system was completed for the spiral casing post-tensioned anchors at Repulse Power Station. Designed and manufactured by …
Repulse Power Station -TAS, Australia 2017

Various projects have been carried out at Karratha Gas Plant (KGP) over a 3 year period, some of the projects were carried out over water …
Karratha Gas Plant – WA, Australia 2014-2017

Following a seismic event RokTel was used by the mine to establish the condition of existing bolts and also carryout QA/QC checks of new/replacement installations. …
Cadia Mine – NSW, Australia 2017

Newly installed ground anchors were tested at Blue Lake pumping station in Mt Gambier, South Australia to enable future monitoring of anchor condition.
SA Water Blue Lake pump station – Mt Gambier, South Australia 2017

Over 200 hollow core and solid bar rock bolts were tested as part of an asset survey to help establish the quality of installation across …
Moglice HEP – Albania 2017

Testing of multi-strand ground anchors to establish current condition as part of a wider asset survey to establish residual asset life
Albany Wind Farm – WA, Australia 2017

A selection of newly installed anchors at the base of Paradise dam in Queensland were tested to ensure full column grouting was achieved and to …
Paradise Dam – QLD, Australia 2017

The RokTel system was used during a 2 year period at Mosaic Potash mine in Canada to carryout testing of ground support to identify broken …