
Ongoing testing and enhanced site-specific calibration of the RokTel unit has enabled the system to be utilised as a condition assessment tool in areas of …
Freeport Indonesia – 2013 to 2018 ongoing

The Gateway Upgrade North (GUN) project in Brisbane required the widening of 6 existing bridges to accommodate the new proposed road. Prior to construction of …
GUN project – QLD, Australia 2016

Various projects have been carried out at Karratha Gas Plant (KGP) over a 3 year period, some of the projects were carried out over water …
Karratha Gas Plant – WA, Australia 2014-2017

The RokTel system was used during a 2 year period at Mosaic Potash mine in Canada to carryout testing of ground support to identify broken …