Repulse Power Station -TAS, Australia 2017
Duration - 5 days
Access - Ground
Design, manufacture and installation of permanent corrosion monitoring system was completed for the spiral casing post-tensioned anchors at Repulse Power Station. Designed and manufactured by CCPS in the UK to integrate into the clients’ current telemetry system.
The system is designed to monitor changes in cross sectional area which could be due to corrosion, breakages and/or increased tension.